Whole window replacement / renovation (including new frame)
DESCRIPTION In a 1960s brutalism, the Boston University's Law Tower was in urgent need of retrofit. Completed in 2015, the retrofit of the facade demanded a labor-intensive process that contemplated selective demolitions and also matching old with new finishings of the reinforced concrete. The renovated building has an increased 100,000 sq. ft.
Law Tower before the retrofit / EECavazos at English Wikipedia
OWNER Sert
DEVELOPER
DESIGN ARCHITECT
EXECUTIVE ARCHITECT
ENGINEER
CONSTRUCTION MANAGER
GENERAL CONTRACTOR
FACADE CONSULTANT
FACADE CONTRACTOR
OTHER CONSULTANT/CONTRIBUTOR
–
1965
Education + Research
265 ft81 m
17
–
ORIGINAL FACADE DESIGN
Concrete Wall
DESCRIPTION In a 1960s brutalism, the Boston University's Law Tower was in urgent need of retrofit. Completed in 2015, the retrofit of the facade demanded a labor-intensive process that contemplated selective demolitions and also matching old with new finishings of the reinforced concrete. The renovated building has an increased 100,000 sq. ft.