2007
Office
95 ft29 m
14
–
Selective Replacement
- Operational energy performance
- Carbon reduction
- Health and comfort
- waste (reuse, recycling, and control of construction debris)
- Interior or exterior glare analysis
- Life Cycle Assessment
- Post occupancy evaluation
OTHER SYSTEMS INCLUDED IN THE RETROFIT
EXTENT OF THE FACADE INTERVENTION
- Glass infill panels were replaced
- Repairs such as re-caulking, new gaskets, sealing